What are the advantages of the plan supported by the 20/20 Vision Committee?
Meets our educational needs in the most cost effective way; minimizes transportation costs and provides long-term stability for the District.
What are the advantages of the plan supported by the 20/20 Vision Committee?
I don’t think the community will support a new high school. We need toThe District is not recommending a new high school. The current plan keeps the 2005 addition as part of the overall renovation plan.
look into renovating parts of it.
Regarding $20 million for new middle school and $47 million for high school:
what does this get us? Is this the Chevy or the Cadillac? As a community we said
we wanted the best for our kids. Does this get us what we want or just the bare
minimum?
When we discuss two phases, does that mean two separate ballot issues to beYes, phasing the project will require two separate bond issues on the ballot. The timing will depend on whether or not voters approve the initial phase and when the operating issue is placed on the ballot.
approved or not?
Will the new buildings be environmentally responsible?The District will pursue the most cost-effective, environmentally friendly building options available. Turner Construction has certified LEED specialists on staff and will recommend appropriate approaches in planning the renovations and new construction.
Grade-level configuration can be supported with data showing a tremendous jump
in test scores.
Is it too late to suggest another option?
It appears that this “decision” was made long before this meeting. As a voter INothing has been decided at this time. The District was diligent in gathering facts, analyzing options and presenting those options to community representatives to gain their input. The Westlake facilities have been studied for over a decade by at least 8 professional groups, which all agreed that something must be done to address the conditions of the facilities. It is up to the community and the Board of Education to determine what solution is put on the ballot and ultimately up to the voters to determine the direction. However, it is important to note that the facilities do create challenges to “Educating for Excellence” because of overcrowding, environment and the drain on the operating fund just to maintain the aging buildings. Proactively addressing the facilities will ensure that we have the ability to maintain our excellence in education in Westlake.
may ask why do we need to spend $120 million to achieve what we are already
doing – “Educating for Excellence.”
Please provide quantified operational, transportation and other costs for eitherAt first glance it appeared that the grade-level plan would be more financially beneficial because it contained five buildings as opposed to six. However, after thoroughly reviewing, the square footage is the same so there was little buildings savings there. It also first appeared that there would be a savings in personnel. However, when we estimated our transportation needs for the new plan, this personnel savings was almost completely negated.
plan or resulting advantage/disadvantage in either plan.
Would like to see only one more meeting before the holidays. Would the schoolThe 20/20 Vision Committee will discuss recommendations for the Board of Education at the next meeting. If there is adequate consensus and the group does not believe it needs another meeting then that will be the last meeting. If the group would like to meet and discuss further then an additional meeting is tentatively scheduled for December 9. The Board of Education is scheduled to meet to discuss the recommendations from the 20/20 Committee on December 10th.
board be willing or allowed to speak to the Committee about what their
intentions are? Timeline?
There should be more discussion on the value of the state 5% share. That is notThis is one of the topics of the next 20/20 meeting and we certainly value the perspective. The District must weigh a possible 5% contribution with the costs of the additional requirements and restrictions of that state funding.
much money for being forced to work with them and live with their rules &
put up with their delays and interference.
How will the marketing campaign be executed? Who will be involved? How will it
be planned? When will it start?
Once the 20/20 Vision Committee has made a recommendation and the Board of Education has acted, there will be a comprehensive marketing strategy to continue informing the community about the issue. This marketing effort will reach as many residents, students, faculty and stakeholders as practical and we will need the help of everyone who supports Westlake Schools. The District has worked diligently to inform the community about facility conditions and overcrowding for years, including over 20 newspaper articles in the last 2 years, and will continue to provide information to our community.
Have grants been explored to finance geothermal and other environmentally
friendly utilities? If not, will you?
Why can’t the District raise private funds for these school buildings?
The district always looks for private funding opportunities for school needs. However, the amount of possible private funding available is not close to the cost of our capital needs and is not a realistic option at this time. The District has explored opportunities with local companies and applied for stimulus grants when possible.
How does transportation affect District costs?
Most busses operated near capacity and our bussing routes are designed to minimize costs and commute times. The District is looking at transportation options to minimize costs including staggering school start times further, scaling back on high school transportation and school siting to maximize our existing transportation capacity. Grade level configuration will add significant costs to existing transportation costs.
Is it possible to change the existing high school into the grades 2-6 building
and rebuild a new high school elsewhere?
The current high school has been added on to or remodeled nine times during its lifespan. It is cost prohibitive to undo those changes and modify the building to accommodate much younger children.
Have you considered locating all non-High School buildings at the Dover/LBMS
location?
The District has considered a school campus structure. There are advantages of a campus, but there also additional challenges such as traffic, utilities, safety and transportation. Those considerations make a large campus highly unlikely.
How does the Bradley Road site figure into the specifics of all three options?
How should we consider it?
What consideration, if any, has been given to the number of students currentlyThe District hires an outside firm to complete enrollment projections annually for the district. Those projects take into consideration the Westlake families that decide to send their children to private schools. Therefore, the District has considered those private school children in projecting attendance in the District.
attending private schools? Does that number enter into the calculation at
all?
If the 20/20 Vision group agrees on and recommends a master plan to the Board,
what are the next steps?
Any recommendation from the 20/20 Vision Committee will be presented to the Board, discussed and taken under advisement in their ultimate decision about the District capital plan. The Board asked this committee to create recommendations that reflect the community’s values and beliefs about the schools and recognizes the critical role of community input in their decisions. In addition to the 20/20 Vision Committee recommendation the Board will survey the community and gather data in diligent pursuit of the best interest of the community.
If we accept OSFC funding are there restrictions on what the District can
and cannot build?There are significant and somewhat restrictive OSFC requirements for
qualification for their 5% funding. Examples of OSFC requirements are: rooms must be a specific square footage; buildings must house a minimum of 300 students; all buildings must have sprinkler systems; all must be air conditioned; and that certain amenities (auditoriums, etc.) are not eligible for funding. There are other requirements not listed here.
Are the costs estimates based on state funding?
Have we contacted Lakewood City Schools to get input about their facilities
project process, successes and challenges?
Utility savings appear low. Book offset with AC? (Compare new buildings v.
existing buildings)
What % of WCSD students utilize our transportation services?
Approximately 52% of Westlake students utilize district transportation for daily morning pick up and afternoon drop off. This number does not include field trips, extra curricular activities, and career technical education at the West Shore Career Center, which all utilize transportation at various times during the academic year.
Can you compare what the Westlake community is paying for its schools to other
districts?